Skip to content
Once the permit is granted, a single contact person coordinates all trades.+41 79 557 14 50
Logo Entreprise du Bâtiment MS SAentreprise-btp.ch

Your raft foundation company in Geneva

Concrete rafts for houses and extensions in Geneva

A raft is a thick slab that serves as the foundation for a whole building. It spreads the weight of the construction over its entire area and at the same time forms the floor of the lowest level.

Our masons pour the rafts of garages, annexes and extensions. For the raft of an entire house, we team up with a partner structural contractor. In both cases, the thickness and the reinforcement are set by a partner civil engineer.

No-obligation quote Call +41 79 557 14 50

What we carry out

A raft is made up of several successive layers, and each one matters for the performance of the whole.

  • Trimming of the formation and layer of compacted crushed stone
  • Lean blinding concrete
  • Insulation under the raft where the project provides for it
  • Edge formwork
  • Reinforcement in bottom and top layers
  • Incorporation of pipes and sleeves
  • Concreting, screeding and floating
  • Starter bars for the walls

How we work

Once the earthworks have been completed by the partner company, we take over the formation. The pipes that run under the raft are laid and checked at this point, because they will no longer be accessible afterwards.

The blinding concrete provides a flat surface on which our masons mark out the walls and assemble the reinforcement. The raft is poured in a single operation when its size allows, in order to avoid construction joints. The surface is levelled with a straightedge and then floated, and it stays protected from sun and wind during the first days.

Specific features in Geneva

Near the lake, the Rhône or the Arve, and in certain clay soils, water may lie close to the surface. The engineer takes this into account and may specify watertight concrete, special joints or temporary pumping during the works.

Energy requirements frequently call for insulation under the raft. This insulation, like the building project as a whole, appears in the permit application prepared ahead of the site.

What helps us prepare your quote

  • The drawings of the building with the dimensions of the raft
  • The geotechnical report if one has been produced
  • The engineer’s drawings or name
  • The route of the pipes planned under the building
  • The current state of the land, excavated or not
  • The access available for the mixer lorry and the pump

Frequently asked questions

Raft or strip footings, which to choose?

This choice belongs to the engineer. It depends on the bearing capacity of the soil, on the presence of water and on the shape of the building.

Can a raft be poured in rainy weather?

Light rain does no harm, a heavy shower washes out the surface. We follow the forecast and move the pour if necessary.

Does the raft serve as the finished floor?

In a garage or a plant room, it can be smoothed and left as it is. In a habitable room, it generally receives insulation and a screed.

Who carries out the excavation before the raft?

A partner earthworks company, whose visit we schedule just before our masons come in.

No-obligation quote

Tell us about your project. We call you back to arrange a visit, then we send you a no-obligation quote. Our team works in French.